Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

After you have designed and printed your targeting cone, you must build it by installing guide tube arrays to direct shuttle probes along their desired trajectories through the brain.

Step-by-step guide

  1. Cut the guide tubes
  2. Make the guide tube bundles
  3. Install the guide tube bundles

 

Info

Filter by label (Content by label)
showLabelsfalse
max5
spacesOEW
showSpacefalse
sortmodified
reversetrue
typepage
cqllabel = "kb-how-to-article" and type = "page" and space = "OEW"
labelskb-how-to-article

Page Properties
hiddentrue
Related issues