When you have fabricated your targeting cone and drive core, and after you have constructed your probe shuttles, you are ready to begin assembling the drive.
Prepare targeting cone
- Cleaning and lining barrel holes
- Assembling guide tube bundles
- Insertion of ground wires
- Insertion of sighting pin
Prepare drive core
- Cleaning out the guide tube and shuttle bolt holes
- Tapping the shuttle bolt holes
- Tap pedestal holes
- Insert guide tube collars
Mate targeting cone to drive core
- Map guide tubes onto shuttle bays
- Splay guide tubes
- Join the targeting cone to the drive core
- Cut guide tubes
- Install probe shuttles
Related articles