Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

When you have fabricated your targeting cone and drive core, and after you have constructed your probe shuttles, you are ready to begin assembling the drive. 

Prepare targeting cone

  1. Cleaning and lining barrel holes
  2. Assembling guide tube bundles
  3. Insertion of ground wires
  4. Insertion of sighting pin

Prepare drive core

  1. Cleaning out the guide tube and shuttle bolt holes
  2. Tapping the shuttle bolt holes
  3. Tap pedestal holes
  4. Insert guide tube collars

Mate targeting cone to drive core

  1. Map guide tubes onto shuttle bays
  2. Splay guide tubes
  3. Join the targeting cone to the drive core
  4. Cut guide tubes
  5. Install probe shuttles

 

 

  • No labels