5.5 - Adding optical fibers

If static optical fibers are to be added to the drive, they should be added to the array now.
The reason for doing this step after electrode loading is that usually some fibers are extending past the drive bottom, so they would interfere with cutting the electrodes.
Also, inserting fibers into the array through prepared openings (see section on making the guide tube array for details) is easier if the drive isn't shielded yet.

If movable fibers are needed, see here for details on how to insert flexible 125u fibers instead, or along with, electrodes.


Supplies
See supplies and tools for links to fiber sources etc. This section assumes that you use 125 or 200 micron glass fibers. Most steps will be the same for plastic fibers.
 

Making fiber stubs by hand

Cut a length of fiber, and remove the plastic cladding. (See here for a video tutorial). This is much easier done for larger pieces at once.

For added safely, cut a small slot or two into the bottom of the ferrule to ensure that it won't slip out of the epoxy. This is especially important for ceramic ferrules. Use a high speed cutting wheel for this.

Now glue the ferrules to the fiber. One easy process is to line up ~5 ferrules on the long fiber, add a drop of glue under each one, and then sliding them over the glue.
Ferrules  have two sides, a convex and a concave one. The convex side needs to be facing the fiber patch cable, the concave side is where the longer piece of free fiber sticks out. Reversing the sides will likely  make it impossible to achieve good coupling.

Once the glue is set, cut the long piece into individual stubs above each ferrule by scoring with the diamond pen and breaking them. Make sure that the cut is not going below the ferrule face or it will be impossible to polish the fiber.

Now cut the fiber stubs to length at the 'bottom' end.

Polish the fibers. (expand this)

Measure the light throughput with a stable light source and light meter. Its very important to use a light source with a fiber of the exact same NA and fiber diameter as will be used later, otherwise the measurement results can be meaningless.

Inserting fiber stubs into the guide tube array
Cut the stub to the right length - when the bottom is at the desired position at the drive bottom, the ferrule should intersect the EIB so that a minimal length of the ferrule remains under the EIB.
If you left an opening in the guide tube array for the fiber to go through, drop the fiber through the correct hole in the EIB and try to hit the hole in the guide tube array. It can help to direct the fiber by holding it with small forceps under the EIB. Once it is in the guide tube array, push it lower till the depth is right (you can usually still adjust by a few 100 micron at this step by changing how deep the ferrule sits in the hole in the EIB) and glue the ferrule to the EIB with epoxy. Make sure to get enough epoxy both above AND below the EIB to hold the ferrule in place securely. It's pretty easy to accidentally pull out a ferrule if it's not glued properly.